2008 Biennial Transmission Assessment Workshop 1
Ten Year Transmission Plans for 2008-2017
- Arizona Public Service
- Bowie Power Station
- Devers Palo Verde No. 2 (DPV2)
- Harcuvar Project
- High Plains Express Initiative
- Navajo Transmission Project
- Santa Cruz Water & Power
- Salt River Project
- SunZia Southwest Transmission Project
- SWTC 10YR Plan
- Tucson Electric Power
- TransWest Express
- Wellton-Mohawk
Utility N-1-1 Study Results
Arizona Reliability Must Run (RMR) Studies
Arizona Extreme Contingency Study Results
Other Investigations Considering Arizona Transmission System Adequacy
National & Regional Issues
- SWAT Subregional Planning Group Update
- CATS HV Status Report
- Southeast Arizona Transmission Study Status Report
- Regional Renewable Energy Transmission Initiatives
- NERC Mandatory Reliability Standards
- WestConnect Activities